| ITEM CODE | 608.1-230V-2000W-3.5MT |
|---|---|
| ITEM NAME | SINGLE HEATED MIXER HOSE 1 230V 2000W 3.5MT FOR MONODISPENSER |
| BRAND | TECHNO |
| COO | MADE IN BHARAT (IN) |
| PT100 / Compatible RTD Sensor | PT100 Sensor / J Type Sensor Must Choose at time of Order |
| CONSTRUCTION | Multi-Layer High Temp Insulation + SS Braided Outer Shield |
| COUPLINGS | CNC Machined Metal End Fittings |
| HEATING ZONES | Single-Zone Continuous Heating |
The Single Heated Mixer Hose 1” – 230V, 2000W, 3.5 Meter is a heavy-duty, high-capacity adhesive transfer hose engineered for industrial Monodispener Hotmelt Systems. Designed for precise temperature control and maximum adhesive flow, this hose ensures smooth, uninterrupted transmission of EVA, PUR, APAO, and high-viscosity industrial glues.
Built using multi-layer thermal insulation, high-grade stainless steel braided protection, and a PT100 RTD temperature sensor, it maintains consistent adhesive viscosity across the full hose length. The 2000W heating capacity provides fast warm-up, stable temperature performance, and uniform adhesive distribution even in demanding 24×7 operations.
Precision CNC-machined metal end fittings deliver superior connectivity, leak-proof performance, and long service life. It is engineered to match OEM standards, offering a reliable replacement for high-end industrial hotmelt equipment.
Key Features
Heavy-duty 2000W heating element for rapid & stable heating
Designed for Monodispener hotmelt adhesive systems
High-temperature resistance for PUR/EVA/APAO adhesives
CNC-machined connectors for safe, leak-proof operation
Accurate PT100 sensor for consistent temperature control
Stainless-steel braided hose for mechanical protection
Minimal heat loss with multi-layer insulation
Long service life even under 24×7 production load
Stable adhesive viscosity ensuring perfect bonding
| USES | Monodispener Hotmelt Machines |
|---|---|
| MOQ | 1 Piece |
| PACKAGE | 1 Hose in Shock-Proof Industrial Packing |
| AVAILABILITY | Back order |
| EST. SHIP | Dispatch in 1–3 Days After Advance Payment |
| UPDATE | 29/11/2025 J |